Water rates: what Coal City charges
Coal City water rates are charged per 1,000 gallons, on rates in effect since April 1, 2025, as the Village of Coal City's Water Billing page lists them [1]:
Gallons used | Water and sewer, per 1,000 gallons | Water only, per 1,000 gallons |
|---|---|---|
0 to 5,999 | $15.53 | $10.10 |
6,000 to 20,999 | $17.30 | $11.25 |
21,000 and up | $16.58 | $10.78 |
Water only is for customers who do not use the Village sewer [1]. The same Coal City page lists garbage at $27.00 a month, or $54.00 a bill, and a $5.00 a month surcharge on each account for the expansion [1].
Worked example: one two-month bill
This is a worked example on the posted rates, not a real home's bill. Say a Coal City home used 5,000 gallons in one billing period. 5,000 gallons is in the first tier, so water and sewer come to 5 times $15.53, or $77.65 [1].
Garbage adds $54.00, and two months of the $5.00 surcharge add $10.00 [1]. The example bill would be $141.65.
A home that uses more water lands in a higher tier. The Coal City Village Code says usage is read to the lowest even 1,000 gallons [2]. To see a real home's usage, ask the seller for its last few bills.
Billing schedule: when the bill comes
Coal City sends water bills every other month, in February, April, June, August, October and December [1]. Each Coal City water bill is due 30 days from its issue date [1]. Under the Coal City Village Code, a bill not paid by the 30th day gets a 10 percent penalty, then another 5 percent for every 15 days it stays unpaid [3].
The Water Billing page links a water eBill sign-up, a direct debit form and online bill pay [1].
Final meter reading: settling the seller's bill
A final meter reading is how the seller's last bill gets figured before you take over. The Village of Coal City's Water Billing page says to call its Water Billing Department for a final meter reading [1]. The timing matters because the Coal City Village Code makes the owner, the occupant and the user of the service each liable for the bill [3].
An unpaid bill can also attach to the house itself. Under its Village Code, Coal City can file a notice of lien with the county recorder once a bill is 45 days unpaid and 15 days past its delinquency notice [3].
Illinois law, 65 ILCS 5/11-139-8, makes delinquent water and sewer charges a lien on the real estate [5]. The same Illinois law says a village has no preference over a purchaser whose rights arose before the lien notice was filed with the county recorder [5].
Water service: starting it in your name
Water service in Coal City starts with an application. The Coal City Village Code says the application to have water turned on is made in writing to the Village Clerk [4]. The Water Billing page says to call the department for water service [1]. The code asks for a deposit with each application, but none when the person applying owns the home [4].
Lead service lines: what Illinois requires
A service line is the pipe that carries water from the main into the house. Illinois law, 415 ILCS 5/17.12, requires every community water supply in Illinois to keep an inventory of its service line materials and a plan to replace lead service lines [7]. When an Illinois water supply finds a lead service line, it must try to notify the building's owner and every occupant within 15 days [7].
The Village of Coal City says it remediated 421 lead service lines in 2025 [6]. Its Water Department page says homes in the remaining area suspected of having a lead service line will get a separate notice by the end of 2026 [6]. Ask the seller whether the home has had one.
Sump pumps: Coal City's sewer rule
Sump pumps in Coal City may not drain into the sanitary sewer. The Coal City Village Code bans putting stormwater, groundwater or subsurface drainage into any sanitary sewer [8]. Ordinance 08-12 set up the Village's Sump Pump Inspection Program to check every building [6].
The Village's own inspection costs the owner nothing, or an owner can hire an Illinois licensed plumber pre-registered with the Village, at the owner's cost [6]. The Village requires an owner found in violation to remove the connection and get a re-inspection within 60 days [6]. During the home inspection in Illinois, ask where the sump pump drains.
Water quality: Coal City wells and soft water
Coal City's water comes from four wells, and the Village water plant, built in 1991, was designed to remove hardness, sulfur and radium [6]. The Village of Coal City says the plant makes about 600,000 gallons a day of soft water at 3 to 5 grains [6]. Its yearly water quality reports are posted on the Water Department page [6]. A home outside the Village system may be on a private well instead; the post on well and septic inspection in Illinois covers that.
Water steps before you close on a Coal City home
- Ask for recent bills Ask the seller for the home's last few water bills, so you see its real usage and which tier it lands in.
- Check the sump pump Ask your home inspector to note where the sump pump drains.
- Ask about lead Ask the seller whether the home has had a lead service line notice from the Village.
- Set the final reading Make sure a final meter reading is set with the Water Billing Department before closing, so the seller's last bill is figured.
- Start service in your name Apply for water service with the Village. Under the Village Code, an owner who applies pays no deposit.
What it means if you buy in Coal City
The water bill is a cost a Coal City listing does not show, and it comes every other month with garbage on it. Getting the usage, the final reading, and the lead line and sump pump answers before closing puts those questions behind you. If you are looking at homes in Coal City, here is where to start.